Friday, October 31, 2014

Right oil pressure transmitter

Be careful when reinstalling the right engine oil press transmitter



It can prevent full engine power with the linkage hitting the cannon plug


On a short runway, it could have dramatic consequences
This is the way that it is suppose to be:



Check first full travel of the power levers and perform a engines run

Main fuel filter pop out / NEED TO BE TESTED AT EACH ANNUAL OR FUEL FIlTER CLEANING

I did a inspection on a Fouga and this is the indication that the main fuel filter was contaminated

The pop out did his job.
THE POP OUT NEED TO BE TESTED AT EACH ANNUAL AND FUEL FILTER CLEANING
If the pop out does not pop out when you push on it from the inside, if your fuel filter get clogged,
the fuel will not be able to bypass the main fuel filter and fuel flow will stop going to the engines and you will have engines shut down due to fuel starvation. 
Be careful that before installing the new filter or clean stainless filter, that the bypass pop out is working and free to pop out and to be reset because some 5606 oil can drop on it (because the hydraulic reservoir is just on the top of it ) and with time the oil dries and become like sticky glue,  that will prevent the pop out to function normally so no way to see if the filter was bypassed or not.


Old paper filter and new stainless fuel filter


After replacing the main fuel filter ( paper filter cannot be cleaned ) everything is
back to normal and pop out retracted



For your information the fuel filter pop out need to be checked every flight by the pilot.

Wednesday, October 29, 2014

Fuel puddle in the inlet of the engine, smoke in the cockpit, smell of jetA fouga - Paris Jet - CM191

































Old seal braking off like a piece of cheese



If you have a fuel puddle in the inlet of the engine , and some smell of JetA in the pressurization system, or smoke on take off when pressurization is on full hot, you have a good 99% chance that the seal called Mariac seal ( most modification was done by the French Air Force because before it was a o-ring , and some engines still have those O-rings) need to be replaced . That seal was replaced every 5 years at least with the French Air Force.
That seal is on the fuel cutoff valve on the engine fuel pump on the accessory support in the bullet of the engine.

Monday, October 13, 2014

A Beaver DHC2 at less than a 1/4 of the price : Broussard MH1521











MAX HOLSTE BROUSSARD MH1521 for sale  • •  •SOLD  SOLD SOLD SOLD 1957 Max holste Broussard for sale.6 seats. Engine P&W 985-AN4. The only Broussard MH1521 certified under the new regulation 8130-2G group 2, allowed in TCA B, carrying passengers, no operational area limitations. No need to reapply for new operating limitations at purchase. Certified/current phase II status. Equipped IFR KX155/KI206. 10 years IRAN performed 02/2011. Hours since IRAN 26.6hours. Landings since new 2549. Engine SMOH 841.8 hours. Propeller 2D30, 46.9 hours SMOH. New interior and seats, camouflage paint, Current annual inspection. Pitot/static/transponder check performed 03/15/2014 • Contact Frederic Bourdais - SWIFT AIR INTERNATIONAL, Owner - located San Pedro, CA USA • Telephone: 310-817-9904 . • 

Saturday, August 23, 2014

CM191 or the 4 seater Fouga ( The only one flying in the world) and video

Recent video of taxiing and flight of N8015Q S/N 001
After a couple of years, the CM191 came out of his hangar to be ready to soar in  the sky around Chicago
For info the CM191 flying video link is on left upper corner of the photo

That aircraft have the same components than the Fouga CM170 except the canopy and some parts of the fuselage.



 A lot of room to work around ( Mechanics Heaven )


Marbore VI C engines

And thanks for the help that I had from Larry, Marty1, Marty2, Robert who is living 1000 miles away in Colorado and the locals tenants of the airport to have that airplane ready to fly.

After talking with the owner, the aircraft will be for sale soon, so like they say come early or go on the waiting line because it is one of a kind and parts are available in case of a need almost everywhere.
Here the dataplate:


And the dream team

Video of the CM191 taxi and flight

Saturday, April 26, 2014

2 Fouga under total renovation

We are working on 2 Fouga since a couple of months to be able to have them certified under the new FAA regulation 8130-2G
It is a major work, and was called EMJ ( Major overhaul ) performed every 10 years on Fouga with Marbore II or 3200 hours, and 11 years on Fouga with Marbore VI or 3400 hours.


After a couple of months we can see the end of the tunel

Soon will be the test flights and certification


 Now the aircraft is ready to fly, everything tested and retested


  A perfect test flight for 40 minutes and no sqwak to be reported
   Thank to David my rear flight mechanic crew.